Case Study

Haystack Landing Bridge

Haystack Landing Bridge

Pages 1 Pages

PROJECT PROFILE WJE www.wje.com Haystack Landing Bridge Movable Bridge Relocation and Rehabilitation | Petaluma, CA OWNER Sonoma-Marin Area Rapid Transit (SMART) CLIENT AECOM BACKGROUND As part of the $428 million project undertaken by SMART to link downtown San Rafael to the Sonoma Airport, Shimmick Construction, Inc. was awarded a $68.7 million contract that included the replacement of the existing Haystack Landing Bridge over the Petaluma River to connect trains between Marin and Sonoma. Rather than refurbish the existing circa 1903 Haystack Landing Bridge at a cost of $20 million, SMART acquired a Scherzer rolling lift bascule railroad bridge from BSNF Railr

Join for free to read