Case Study

SHARQ 3 COOLING TOWER

SHARQ 3 COOLING TOWER

Client: Eastern Petrochemical Col (SHARQ) Jubail, Kingdom of Saudi Arabia Value of Contract: EUR 46.57 million Share: 100% Construction Period: 08/2005 – 09/2007 PROJECT DESCRIPTION: Lumpsum turnkey construction of one Seawater Fan Assisted Natural Draught Round Cooling Tower for the capacity of 161000 m3/h with the height of 72m, base diameter of 122m, top diameter of 80m and the annexed pump sump (dimensions 45.20 x 18.40 x 8.65m) SHARQ 3 COOLING TOWER JUBAIL / KINGDOM OF SAUDI ARABIA STRABAG International GmbH Siegburger Str. 241 50679 Cologne, Germany www.strabag-international.com

Join for free to read