Case Study
Selma-Kingsburg-Fowler County Sanitation District
Program Highlights (Over 20-year project life) • Expected to achieve $14.7MM in net savings, with guaranteed savings and performance • Expected to create the equivalent of 244 jobs resulting from the economic multiplier effect • Expected to reduce carbon emissions equivalent to removing 700 cars from highways annually Technical Scope • 2.39 MW ground-mounted single- axis tracking solar PV system • 38-kW solar PV parking structure at the Administration Building • Indoor and outdoor LED lighting retrofits • HVAC unit replacements • 500 kW/1,000 kWh energy storage system including intelligent cloud-based software and lithium-ion battery storage THE OPPORTUNITY Selma-Kingsburg-Fowler County Sanitation District (SKFCSD) is a public agency that provides collection, treatment, and