Case Study
Greater Lawrence Sanitation District
large volumes of waste water, and a finer screen field. Previously, GLSD operators were having problems with solids getting through their 1" screen field, and were able to incorporate a 3/8" field with the Mahr ® . The most compelling reason for purchasing the Mahr ® Bar Screen, however, was that they met the flow requirements with a smaller screen field yet would occupy the same footprint as the previous equipment. No demolishion of