Case Study
Seaford Head Swimming Pool
LoadTracker combined heat and power (CHP) SEAFORD HEAD SWIMMING POOL - CASE STUDY Low Carbon Energy Solutions for Building Services The Challenge To provide a heating/ hot water system that would be less expensive to run than conventional boilers. The Solution Supplied and installed one 15kWe/30kWth LoadTracker CHP unit to provide 60% of site heating and hot water demand. The Project A refurbishment of an existing leisure centre complex t