Case Study

Pre­demolition audit: Wellingborough Swimming Pool

Pre­demolition audit: Wellingborough Swimming Pool

Pages 2 Pages

The project BRE was commissioned to carry out a pre­demolition audit of Wellingborough Swimming Pool. Having come to the end of its service life, the pool was due to be demolished prior to the construction of a new one. This indoor public facility, which opened in 1970, was built using red brick to construct a building envelope containing a 25­ metre pool, a smaller teaching pool and seating for spectators. The pools were set i

Join for free to read