Case Study

Seafastenings design

Seafastenings design

Pages 3 Pages

The scope We were asked by a major UK oshore installation contractor to assist their structures team in the design of seafastenings for a piling spread. The piling spread was to be installed across two oshore campaigns and seafastenings were required for both mobilisations. Due to the operational schedule of the vessel, the project needed to be completed in a short timeframe of six weeks. Our scope of work involved the detailed seafastening fabrication, assembly and deck plan drawings for two deck spreads comprising of over fty pieces of equipment. During transit to site, equipment has a tendency to slide around a deck due to vessel motion and environmental loads. This is a signicant safety hazard for oshore workers and so all deck equipment must be adequately restrained by seafasteni