Case Study

Saving Money as Pumping Requirements Increase

Saving Money as Pumping Requirements Increase

Pages 4 Pages

Case Study-Fairfield Glade Spring 2015 Saving Money as Pumping Requirements Increase Fairfield Glade had massive infiltration and inflow (I&I) issues with a sewage collection system. Current pumps at the lift station could not keep up with high I&I events and sewage spills were likely during big rain events. Instead of upgrading the submersible pumps in lift the stations, sound attenuated Pioneer Pump diesel engine-driven pa

Join for free to read