Case Study
Santos Fletcher & Finucane Development Project
Santos Fletcher & Finucane Development Project Subsea Electro-Hydraulic Umbilicals and Subsea Power Cables JDR has delivered thermoplastic control umbilicals, ESP (electrical submersible pump) power cables and distribution equipment to Australian oil and gas operator Santos for the Fletcher & Finucane Project. The project required JDR to design, manufacture and supply a turnkey system for delivery of power, chemical injection and hydraulic control to three production wells. The Fletcher and Finucane developments are tie backs to existing Mutineer & Exeter infrastructure, which is located approximately 150km offshore, north of Dampier, Western Australia. Water depths range between 133 and 155 meters. Crude oil will be produced via flexible flowlines to the Mutineer manifold and Modec Ventur