Case Study

Salt Water Disposal Well

Salt Water Disposal Well

Case History H2010 Salt Water Disposal Well Salt Water Dispoal Well - 1998 Wingate Field - Attica, Kansas USA (Pioneer Energy) 2 3 /8”, 2000 psi Aliphatic Amine Downhole Tubing 100-200 psi (0,7 - 1,4 MPa) Ambient Threaded and Coupled (T&C) 3809 feet (1160 meters) 5 1 /2” lockset packer with on-off tool set at 3089 feet (1160 meters) with approximately 522 feet (159 meters) of 2 3 /8” tubing below packer. Downhole tubing was installed in 1998

Join for free to read