Brine Disposal line

Brine Disposal line

Taper/Taper adhesive-bonded Joint Centraliser detail DN900 Bondstrand in DN 1200 casing © 2012 National Oilwell Varco. All rights reserved. CH7213 supersedes FP1020 - November 2012 www.fgspipe.com • fgspipe@nov.com While creating gas cavern storage facilities by controlled solution mining process, the produced brine is transported by pipeline to the mouth of the river Ems adjacent to the North Sea. An existing steel line with cathodic protec