Case Study

Rowan Gorilla VI, Dry Docks, Dundee

Rowan Gorilla VI, Dry Docks, Dundee

Pages 2 Pages

Location: Rowan Gorilla VI, Dry Docks, Dundee Case Study: Rowan Drilling During a scheduled shipyard visit we were initially contracted to remove all residues and clean all tanks onboard to allow inspection. Sureclean Scope Primary scope of work was to provide the necessary manpower and equipment for the removal of all residues and cleaning of all tanks onboard the Rowan Gorilla VI; allowing inspection and remedial repairs to be carried out. Scope of works were extended to include: Removal of all residues and cleaning of all tanks Surveying, Camera Inspection and cleaning of entire HVAC system Surface Preparation and Painting of hull HP Jetting and vessel entry spread for the chlorination of two pot water tanks Technical Challenge Logistics associated with resourcing, planning and managing

Join for free to read