Pages 2 Pages

PROJECT PROFILE Summary Mainmark carried out a complete rehabilitation of the ROM bridge embankments at a coal mine-site. With the mine operations closed for 30 days, Mainmark cleared vegetation and injected an expanding resin in a grid pattern, into the voids, between the existing veneer of shot-crete embankment lining and the soil embankment below. Mainmark installed a resin injected anchor system, installed re-enforcing mesh and then appli