Case Study

Rock Weir Consolidation

Rock Weir Consolidation

Pages 1 Pages

PROJECT PROFILE Summary Uretek grout was used to fill and seal breaches in a dam structure and downstream in the rip-rap area to conglomerate the structure into a single impervious stable mass. This work was done to assist the local Shire Council’s water management and conservation strategy. Objectives The objective was to stop the enormous volume of water loss from the weir in this very dry part of the country. Solution Located within the h

Join for free to read