Case Study

Robert Moses Niagara Power Plant Instrumentation

Robert Moses Niagara Power Plant Instrumentation

Pages 1 Pages

The Niagara Power Project, located on the Niagara River above the American Falls, includes a 350-foot-high concrete dam; two power stations containing 25 generating units; a 6.4 mi. long, 41 ft.-high earth and rock? ll dike and twin underground concrete conduits, each 4 mi. long, which carry water from the river to an open forebay excavated in rock. GEI has provided consultation to New York Power Authority on a number of struct

Join for free to read