Case Study
Riverside, Canary Wharf, London
The site was formerly a dockyard and contains a number of buried dry docks. It will form the location of a twin tower skyscraper development of 38 and 32 floors, and involves excavation of a basement down to 14metres. Construction is due for completion in 2011. CGL was appointed to advise on excavation, removal and disposal of the spoil material from the site. We undertook a full assessment of the ground investigation data, particularly t