Case Study

River Wall Replacement Scheme, London

River Wall Replacement Scheme, London

Pages 1 Pages

Case Study: River Wall Replacement Scheme, London Client: Consulting Engineer: Services Provided: Location: Value: Year: www.van-elle.co.uk 01773 580 580 info@van-elle.co.uk Van Elle was selected by main contractor Jackson Civil Engineering to install a hard-hard secant wall on a river wall replacement scheme on Dormay Street in London. This particular solution was chosen in order to meet the requirements of the 65-year lifespan requested by the client.. Van Elle used a Soilmec SR-80 rotary piling rig to install 37No. 1200mm Ø piles, primary 15m depth and secondary 8m depth, with C30/37N concrete. The ex- isting wall was at risk of collapsing into the Bell Lane Creek (which runs into the River Thames) and therefore it was important that s

Join for free to read