Case Study

River Stour Dive

River Stour Dive

Case Study : Hampshire River Stour – Bridge Pier Scour Protection Client: Network Rail Contractor: Dyer and Butler Duration: July 2012 – 10 weeks Consultants: JBA Consulting AquaticEngineering were approached by JBA Consulting in 2011 to look at the feasibility of installing a silt (and grout) retainment curtain around a supporting pier of a bridge crossing the River Stour, the bridge carried the London Water

Join for free to read