Case Study
Rising Main Surge Analysis
© MMI Engineering, 2014 www.mmiengineering.com Page 1 of 1 info@mmiengineering.com Rising Main Surge Analysis Client Confidential North West England Introduction A needs study by our client identified that there was a significant risk of interruption to the District Metered Areas (DMA’s) supplied by the Wilmslow high lift Pumping Station (PS) and Alderley Edge Service Reservoir (SR). The existing high-lift pumps were also t