Analysis & Design for Final Clarifiers Budds Farm Sewage Treatment Works Havant, UK The Budds Farm Sewage Treatment Works (STW) operated by Southern Water treats waste water from the Portsmouth and Havant catchments. Prior to 2006, the STW at Budds Farm had 8 final clarifiers of 35m internal diameter. In order to meet the requirement of the projected AMP4 flows, the existing settlement tanks were modified and 2 new 35m diamete