Case Study
Rexnord Bucket Elevator And Conveyor Upgrades Cut Downtime At Cemex Cement Plant
REXNORD ® BUCKET ELEVATOR AND CONVEYOR UPGRADES CUT DOWNTIME AT CEMEX CEMENT PLANT CASE STUDY Since upgrading its bucket elevators and conveyors, the Dixon, Illinois plant of Cemex USA has improved productivity with substantial reductions in downtime. The dry process facility, originally built in 1956, produces clinker and Portland cement 1, 2 and 3. It has a capacity of 700,000 tpy of cement and 550,000 tpy of clinker. One elevat