Case Study
Additional Conductor Guide Extends Platform Life.
ADDITIONAL CONDUCTOR GUIDE EXTENDS PLATFORM LIFE. Flexibility and teamwork ensure the success of an unusual project to add a new well slot to an existing offshore platform. Claxton was initially sub-contracted to design, fabricate and install a new conductor guide and centralizer in the platform’s splash zone. Fitting the new guide, a great team effort with main contractor PSN’s construction team, was a complete success; the guide was lifted over