Case Study

Repair Of Refrigeration System For TEDAC Test Facility

Repair Of Refrigeration System For TEDAC Test Facility

Pages 1 Pages

value promise SSOE was able to reorient the replacement pumps so the conduit could be reused, resulting in a savings of $50,000. By reusing storage and surge tanks and suggesting an alternate insulation for piping, our team was able to saveanother $60,000. To date, total cost savings equal $110,000. The refrigeration system replacements are expected to produce an annual energy cost savings of $780,000. location Arnold Air Force Base,

Join for free to read