Case Study

Blast Resistant Central Control Facility

Blast Resistant Central Control Facility

Pages 1 Pages

value promise SSOE applied significant value engineering to the preliminary schematic design. Through design innovations, utilization of specialists in blast resistant design, and other ideas, Husky realized more than $7 million in savings. size 250,000 SF location Lima, Ohio highlights Design-build Designed to withstand reflected pressures of 7.1 psi Compliant with API Recommended Practice 752 Office features an atrium, which filters n

Join for free to read