Case Study

Remediation of Former Gasworks, Warwick

Remediation of Former Gasworks, Warwick

Pages 2 Pages

CASE STUDY Remediation of Former Gasworks, Warwick, Background RAW has overseen the successful remediation of the Former Warwick Gasworks, a project completed on time and to budget. The remedial phase included the installation of a Soil Mixed Barrier System, which contained reactive media for the treatment of perched water. The site had experienced a long period of gas production from 1822 to the early 1960s, and both soil

Join for free to read