Case Study
Gasworks Remediation
Gasworks Remediation - Kings Cross, London Ecologia was appointed to design, manufacture, commission and operate a bespoke system for the remediation of a former gasworks site located at Kings Cross, London. The remediation equipment was required in order to meet the following client brief: • Drill a predefined number of extraction wells in three gasholders; • Dewater gasholders prior to excavation, in accordance with the overall site programme;