Case Study
Rehabilitation Of Berth 12, Castle Island Terminal
The project consisted of the rehabilitation of an existing berth in South Boston, which includes an 80-foot-long timber pile-supported deck, dredged slope outboard of a timber bulkhead, and a container storage area inboard of the bulkhead. The rehabilitation of the berth included upgrading the structures to support higher surcharge loadings and the construction of pile-supported rails for a new gantry crane. GEI was engaged to e