Case Study
Engineering Evaluation, Design and Construction Support Services, Penstock Rehabilitation Construction Project
Engineering Evaluation, Design and Construction Support Services, Penstock Rehabilitation Construction Project
GEI assisted Minnesota Power (MP) in an options evaluation for repair of their aged 1924, 18-foot-diameter penstock. The thorough options evaluation led to MP selecting the slip-lining rehabilitation option. The 16.4-foot- diameter slip-lined pipe design was prepared and submitted to FERC for approval. Following FERC acceptance of the design, GEI supported MP and Brennan Construction through successful and efficient completion