Case Study

Reduction Fill/Retaining Wall Back?ll

Reduction Fill/Retaining Wall Back?ll

Pages 3 Pages

Load Reduction Fill / Retaining Wall Back? ll Soldier Field, Chicago, IL 2002 Density: 30 pcf Volume: 30,000 cy An economical solution was designed to minimize the vertical loading and the differing amount of earth pressure bearing on the north four- story, 2,500-car, underground parking structure for the Renovation of Soldier Field. Due to the poor existing ? ll soils along Lake Michigan, back? lling the structure with PROVOTON foam concrete g

Join for free to read