Case Study

Load Reduction Fill/Void Fill

Load Reduction Fill/Void Fill

Pages 1 Pages

Load Reduction Fill / Void Fill United Cargo Building, Chicago IL Chicago O’Hare Int. Airport 2001 Density: 27 and 30 pcf Volume: 30,000 cy A cost-effective solution was sought that would enable United Airline’s new shipping container handling system to operate on one level of an existing building. PROVOTON foam concrete was chosen to back? ll a 275’x 150’ section of the building’s basement 20’ deep to support the new automated handling equipme

Join for free to read