Case Study

Recovering Performance Loss Due to Air Binding

Recovering Performance Loss Due to Air Binding

Pages 1 Pages

Recovering Performance Loss Due to Air Binding – A Case Study – In 2007 Intek was presented with an opportunity to study an underperforming Ingersoll Rand condenser, and plan a program for increasing performance via engineered retrofit. The primary objectives for the condenser study were to find a means to mitigate ongoing load limiting conditions in the summer time due to high condenser pressure and to improve chronic poor condenser p

Join for free to read