Case Study
Record Size Microtunnelling with HOBAS CC-GRP Pipes - Burakowski-Bis sewer in Warsaw successfully realized with HOBAS Pipes D 3270
Record Size Microtunnelling with HOBAS CC-GRP Pipes - Burakowski-Bis sewer in Warsaw successfully realized with HOBAS Pipes D 3270
h Case Study | Page 01 In the Polish capital Warsaw, a 3.2 km long HOBAS Pipeline D e 3270 has been microtunnelled on the left bank of the Vistula River to transport sewage and rainwater from the central and northern districts of Warsaw to the wastewater treatment plant (WWTP) Czajka. The installation involved the largest-diameter microtunnelled curve ever realized with a CC-GRP pipe so far. The new line will dis- charge the old Burakowski se