Case Study

HOBAS CC-GRP Culverts DN 3000 Jacked Under Railway

HOBAS CC-GRP Culverts DN 3000 Jacked Under Railway

Pages 1 Pages

Year of installation 2014 Installation time 2 months Total length of pipe 136 m in total, 4 parallel lines of 34 m each Diameter D e 3000 Pressure class PN 1 Stiffness class SN 40000, SN 64000 Application Culvert beneath railway for flood protection Installation method trenchless installation / pipe jacking Client PKP (Polskie Linie Kolejowe) S.A. (Polish rail infrastructure company Contractor / Subcontractors Intercor / PROI, PROI2 Ad

Join for free to read