Case Study
Real Savings Delivered Through Development Optimisation
Real Savings Delivered Through Development Optimisation REGAIN CONTROL OF YOUR OPERATION With over break in development mining running at approximately 18% at this underground mine, improvements were required to increase the efficiency of the development cycle and reduce costs. Dyno Nobel together with the mine undertook a development optimisation project with the aim of reducing the over break to levels as low as possible whi