Case Study

READY, TEST, GO

READY, TEST, GO

NZTA fast-tracks application testing with Revera Homeland IaaS READY, TEST, GOREVERA CASE STUDY: NZTA The 2.4km Waterview Tunnel between Pt Chevalier and Mt Roskill is the final piece of Auckland’s 48 km Western Ring Route, connecting Manukau, the city, West Auckland, and the North Shore. Since opening, the tunnel is credited with improving traffic flow on Auckland roads, including almost halving travel times between Auckland’s CBD and the airport. Behind the scenes, software managing traffic (ATMS) and plant (PMCS) devices keeps traffic moving through the tunnel. Like the tunnel itself, new management software called Sidera was planned, tested, and integrated with other NZTA systems well before the tunnel opened. Testing applications in a production-like environment in th

Join for free to read