Case Study

RapidBoil was installed into a NATS air traffic control centre in Ayrshire, Scotland.

RapidBoil was installed into a NATS air traffic control centre in Ayrshire, Scotland.

CASE STUDY: NATS, Prestwick Centre KEY INFORMATION INSTALL DATE: APRIL  TRIAL PERIOD:  MONTHS REPORTED SAVINGS:  . , ,kg (CO2) RapidBoil was installed into a NA TS air traffic control centre RapidBoil was installed into a NATS air traffic control centre in Ayrshire, Scotland. The Prestwick Centre in Ayrshire is NATS northern office. It is a , square meter mixed use commercial building. The site is heated by air conditioned systems and fan coils which is powered by  x Ferroli .kW boilers (combined rating of ,.kW). The system was dosed with the closed system inhibitor (Chem Aqua ). Existing records of the system noted the combined system volume as being , US Gallons needing  US Gallons of RapidBoil. The site was also dos

Join for free to read