Case Study

RapidBoil Case Study - Oakwood General Hospital

RapidBoil Case Study - Oakwood General Hospital

Preston City Council trialled RAPID Boil at their Town Hall located in Preston City Centre. CASE STUDY: Preston Town Hall, Lancashire Preston City Council KEY INFORMATION REPORTED SAVINGS: .  ,kg (CO 2 ) INSTALL DATE: FEBRUARY  TRIAL PERIOD:  MONTHS BOILER SPEC: X VITOROND  BOILERS VOLUME INSTALLED:  LITRES Tel: Email: info@raiseenergysolutions.com Save Energy. Make Energy. Gift Energy. The five-floor office building, built between 1862 and 1866, is heated by 3x Vitorond 200 Boilers with a maximum output of 300kW . The site is heated by a large number of ornate cast iron radiators with a single air handling unit (AHU) for the Council Chambers. Aer a system survey it was determined that 44L of RAPID Boil was required, installation took

Join for free to read