Case Study
Rapid expansion – Delbanco Myer
Rapid expansion – Delbanco Myer When Delbanco Meyer, a leading supplier of household textiles and brush materials, first built a new distribution centre, adjacent to the A1M, at Stevenage, a Redirack narrow aisle pallet racking scheme was installed. The company’s rapid expansion thereafter soon created the requirement to extend the site further. Kieron Dunne is Delbanco Meyer’s Logistics Director. He explains. “Turnover has almost doubled in four years, due to an increasing demand for our products from a number of well known High Street retailers. We needed to expand our storage and distribution facilities to cope with the extra demand. ” The new 31,000 square foot extension allowed for additional racking which wasinstalled in two phases. In total an extra 6214 pallet locations have been c