Case Study
Coles Myer Distribution Centre - Australia Post-Tensioned Slab On Grade
Coles Myer Distribution Centre - Australia Post-Tensioned slab on grade ? Slab on Grade prior to concrete pour. one end of the building. To satisfy the manufacturers requirement to have no slab expansion joints beneath the racking system, extremely long slabs were required to be constructed. The longest slab constructed is VSL NSW has recently completed construction of 67,000m² of post tensioned slab on grade at Eastern Creek. NSW. This