Case Study
Railroad Rail Testing
Case Study – Railroad Rail Testing Customer Problem A manufacturer of steel railroad rails had a requirement to test 100% of a rail product using visual and magnetic flux inspection. This was very time consuming and required a lot of personnel to complete. A system was needed which could test multiple locations around the rail while moving at a production line speed of up to 200 feet/minute. The primary purpose of the system was to de