Case Study
Mystic River Railroad Bridge Replacement
GEI was responsible for geotechnical and environmental services related to the construction of this commuter rail drawbridge spanning the Mystic River. The project included realignment of commuter rail tracks in various communities. Geotechnical services included value engineering and design revisions for bridge pier cofferdams and on-site observation during cofferdam construction. Environmental services included sampling and a