Purge Ducting Ratcliffe Power Station, Nottinghamshire
Case Study Copyright © 2014 Power System Services Limited. | www.pss-uk.com. | Telephone: +44(0)1246 268 800. | Fax +44(0)1246 268 811 Purge Ducting Ratcliffe Power Station, Nottinghamshire Customer: e-on In 2010 Power System Services were asked to work alongside key strategic partners to design manufacture and install Purge Ducting for the Flue Gas De- sulphurisation plant at Ratcliffe- on –Soar power station in Nottinghamshire. The major element in our scope was to detail and manufacture some 200m of formed circular ducting and surface coat to protect the material of construction from the highly acidic environments present at low temperatures in flue gas lines. The duct was 100% manufactured in our large factory and trial assembled. The Duct sections were