Case Study
Public High School
Public High School Building Type: Public High School Project Type: Retrofit Qualifying Systems: Lighting/HVAC Square Footage: 237,049 Energy Savings: 25.70% LPD Reduction: 58.10% Deduction Per Square Foot: $1.20 Total Section 179D Deduction: $284,458.80 A public high school design project was completed by an engineering firm in Alabama. As part of a school district wide energy efficiency retrofit project, this 237,049 square foot school completed upgrades of its HVAC and interior lighting systems. Building components installed as part of this project included CO2 sensors and building controls systems and T8 lighting. As a result of the system upgrades, the school achieved a power and energy savings of 25.70% for the HVAC system and an LPD reduction of 58.10% for the lighting system. The en