Case Study
PTSG And Nalco Ecolab: Success Secured Through Collaboration
PTSG and Nalco Ecolab: success secured through collaboration Case StudyPTSG first secured the contract with Nalco Ecolab to install lightning protection systems on the Weavergate Plant in Cheshire in 2015. The electrical services team worked throughout the entire Weavergate site, both internally and externally and on structures both existing and yet to be built. Not only did this allow the engineers to gain a deep understanding of how the