Case Study

Prudhoe Bay Extended Reach Fill Cleanout with Coiled Tubing in 10,600 Ft. Horizontal

Prudhoe Bay Extended Reach Fill Cleanout with Coiled Tubing in 10,600 Ft. Horizontal

Case History: HydroPull™ SC Stimulation and Cleanout Prudhoe Bay Extended Reach Fill Cleanout with Coiled Tubing in 10,600 Ft. Horizontal Two shallow, extended reach wells on the North Slope of Alaska required fill cleanouts. The TVD of the first well was 3,800 feet with a measured depth of 14,400 ft. for a total horizontal extent of 10,600 ft. The horizontal extent of the second well was 10,466 ft. Both wells were completed with 4 1/2-inch ca

Join for free to read