Case Study

Extended Reach Solvent Placement Using HydroPull SC with 1 1/2-in. Coiled Tubing in 6 1/8-in. Openhole

Extended Reach Solvent Placement Using HydroPull SC with 1 1/2-in. Coiled Tubing in 6 1/8-in. Openhole

Case History: HydroPull™ SC Stimulation and Cleanout Extended Reach Solvent Placement Using HydroPull SC with 1 1 /2-in. Coiled Tubing in 6 1 /8-in. Openhole This job required re-entry into a 6 1 /8-in. (155 mm) diameter horizontal openhole from 4,760 ft. to 8,070 ft. (1,451 m to 2,460 m) MD to place solvent. The horizontal section was 3,313 ft. (1,010 m) long. Prior attempts to enter this well with 1-in. (25 mm) continuous rod failed at 6,2

Join for free to read