Case Study

Providing Enhanced Assurance for Power Supply via CCHP to the First Airport in China That Uses a Distributed Energy System

Providing Enhanced Assurance for Power Supply via CCHP to the First Airport in China That Uses a Distributed Energy System

Trigeneration Case History Changsha Huanghua International Airport, Hunan Where: Changsha Huanghua International Airport, Hunan What: Two 1160 kW C1160 N5C Lean-Burn Gas generator sets Purpose: The Combined Cooling, Heating and Power (CCHP) system provides a daily power supply for the airport, as well as cooling water, domestic hot water and heating in winter. Primary choice factors: Provision of uninterrupted operation and stable ou