Case Study
Proven Protection Against Petroleum Gas And Water Migration
PROJECT CASE STUDY North America: 847.851.1800 | 800.527.9948 | www.CETCO.com Proven protection against petroleum gas and water migration. GeoEngineers, Inc. was chosen to assess the project site’s soil conditions and offer solutions for contaminated soils and water. Ultimately, LIq UId Boot ® Gas Vapor Barrier was chosen to mitigate the subsurface soil contamination issues resulting from residual pretroleum hydrocarbon contamination. CEt Co