PROJECT CASE STUDY PROJECT CASE STUDY www.cetco.com Spray-applied barrier is proven vapor mitigation strategy for site with methane. The site for the new Canada Post headquarters was situated on a former industrial location and is a major redevelopment zone for the city of Toronto. The site was contaminated by methane as well as located on bayfill. Construction of a 64,000 sq. ft. facility will be owned by Canada Post and used to sort mail pr