Case Study
Proplan
Pulp Mill & Recovery Production Optimisation Analysis of a pulp & paper mills operation over a 2-week period showed a potential increase in output that could be achieved by using Pro-Plan on a daily basis. The Pro-Plan Pulp Mill and Recovery Optimisation System is an optimisa- tion system that uses simulation and in-built decision making rules to de- termine the best operating strategy for any given situation. It is demand driven, and will maximi